Short answer: probably yes.

Geauga County does exempt some decks from permitting, but the exemption is narrower than most homeowners expect — and the reason people get it wrong is a single word in the rule.

The actual rule

The Geauga County Building Department does not require a building permit for a deck that is:

That last word — and — is where people get caught. It isn't a menu. A deck has to satisfy all three conditions to skip the permit. Miss one and you need a permit.

Which means the deck most people actually want — attached to the back of the house, off the kitchen or the slider — needs a permit no matter how small it is. Attached is attached. A 10x12 platform bolted to your house is a permitted structure even though it's under 200 square feet and only a step off the ground.

The exemption is really written for a freestanding platform in the yard. A little floating deck by the fire pit, a landing pad for a hot tub set away from the house. Useful, but not what most people mean when they say "deck."

Who issues it

For most of Geauga County, that's the Geauga County Building Department (440-279-1780). The county department covers all the townships — Munson, Bainbridge, Newbury, Russell, Chester, Auburn, Claridon, Hambden — plus the City of Chardon and the villages of Burton, Middlefield and Aquilla.

There's one exception worth knowing: South Russell runs its own building department. If you're in South Russell, the county isn't your office.

One more thing that confuses people: the Geauga County Engineer also has a page for contractors, and it comes up in searches. That office handles roads — driveway aprons, right-of-way work, ditch enclosures. It has nothing to do with your deck.

Planning a deck this season? We pull the permit as part of the job. Get a free quote →

What the permit is actually checking

It isn't a formality, and it isn't the county being difficult. A deck is one of the few things a homeowner builds that holds a group of people several feet off the ground. The inspection is looking at the parts you can't see once it's finished:

Footings. How deep the posts go, and whether they're below the frost line for your area. This is the single biggest reason older Northeast Ohio decks go bad. A deck on shallow footings will heave and settle through a few freeze-thaw cycles, and once it's moving, everything else — the ledger, the railings, the stairs — starts pulling apart. You can't fix that later without going back to the ground.

The ledger connection. The board that ties the deck to your house. Done wrong, it's both a structural problem and a water problem, because it's also the place where water gets behind your siding and into your rim joist. Deck collapses almost always start here.

Guards and stairs. Railing height, how far apart the balusters sit, riser height and tread depth on the stairs.

Beam and joist spans. Whether the lumber is actually sized for the distance it's covering.

What happens if you skip it

Nothing, usually — until something happens.

It surfaces at resale, when a buyer's inspector notes unpermitted work and the buyer's agent asks for documentation you don't have. It surfaces when you go to add on later and the county pulls your property record. And it can surface in an insurance claim, if a structure that failed turns out never to have been inspected.

None of that is common. All of it is expensive and slow when it happens, and all of it lands on the homeowner — not the contractor who talked you out of the permit.

Which brings up the useful test: if a contractor suggests skipping the permit, that tells you something about the contractor. Sometimes it's genuinely a small job that's exempt. Sometimes it means they're not registered with the county and can't pull one.

You can check that. Contractor registration is public, and it takes a phone call.

If you're in Lake County instead

The structure is different there, and it trips people up: in several Lake County communities you need a zoning permit from your city and a building permit from the county — two offices, two applications, and the zoning one often has to come first.

We wrote that up separately: Zoning Permit vs. Building Permit in Lake County.

The short version

If your deck attaches to your house, plan on a permit. If it's a small freestanding platform low to the ground, you may be clear — but confirm it before you dig, because the county's answer is free and rebuilding footings is not.

We handle the permit and the inspections as part of every deck we build in Geauga County, so it isn't something you have to chase.

See our deck work → · Request a free quote →


Requirements change and every project is different. Confirm your specific job with the Geauga County Building Department at 440-279-1780 before you start. Last reviewed September 2026.